Closets came out today, as well as more paneling, including walls and ceiling! The ceiling was especially challenging because the panels had been fitted into these white supports. Trying to wiggle the panels out was really hard, so I ended up cutting part of the support to get started. Cut a little, wiggle a little, cut a little more, wiggle a little more. Try to get a hold somewhere, see if something will come loose. That's how the process went.

There's the "in" for the electrical. No wonder nothing worked. I think we're probably lucky that it just didn't work at all. Who knows what might have happened if it did.
Closet floor. Water tank is in there, I'm assuming? 
This is the inside of a closet. That's wet wood. I've got a leak up on the roof that I'm going to have to figure out. This is also on the side where the tree fell, so I'm going to guess that the tree put some kind of hole in the roof. More to research!
Here's the side of the ice box. We are planning to install an electric mini-fridge in its place.

This is the inside of the kitchenette. I had originally hoped that maybe we could just leave it in place. Uhhhhh, nope. It will be coming out too. I'm going to need some help with disconnecting the sink.